SOLID WASTE MANAGEMENT PROJECTS
Cost effective engineering solutions
Services offered in solid waste management
Sanitary Landfill Projects

SOLID WASTE MANAGEMENT PROJECTS


BCHOD has been instrumental in the sustainable development of the country’s engineered sanitary landfills mostly in mining towns, with recent completion of the Norton and Zimplats SMC Landfills. Ongoing projects involve the engineering of landfills for the following urban areas: -Kadoma, Kariba and Chinhoyi, all at different stages of construction. Statistics show that BCHOD has been instrumental in the construction of most of the engineered landfills currently in use nationwide. Our experience and expertise in engineering sanitary landfills in Zimbabwe and the region, we believe to be well recognised in the industry.

COST EFFECTIVE ENGINEERING SOLUTIONS

Our approach in Landfilling solutions is in using locally available materials i.e.

SANITARY LANDFILL PROJECTS

The following are some of the Landfill assignments undertaken by the Firm in Zimbabwe and adjacent locations. The schemes vary in value.

NORTON TOWN COUNCIL
SANITARY LANDFILL
Preliminary investigation and preparation of sketch designs, Terms of reference for Environmental impact assessment, Review EIA report, Geotechnical and topographical surveys, Liaising with the relevant stakeholders, Composite liner systems, Details of leachate collection and management systems, Details of storm water drainage and access roads to site, Construction details, Cost estimates, Site supervision, Landfill planning strategies, Training for operational staff and preparation of the Operations and Maintenance Manual, Preparation of tender documents, Tender adjudication and Construction supervision
USD$ 450 000.00
KADOMA MUNICIPALTY Preliminary investigation and preparation of sketch designs, Terms of reference for Environmental impact assessment, Review EIA report, Geotechnical and topographical surveys, Liaising with the relevant stakeholders, Composite liner systems, Details of leachate collection and management systems, Details of storm water drainage and access roads to site, Construction details, Cost estimates, Site supervision
USD $290 000.00
LANDFILL AT SELOUS
METALLURGICAL COMPLEX
Preliminary investigation and preparation of sketch designs, Review EIA report, Geotechnical and topographical surveys, Liaising with the relevant stakeholders, Composite liner systems, Details of leachate collection and management systems, Details of storm water drainage and access roads to site, Construction details, Cost estimates, Site supervision, Landfill planning strategies and preparation of the Operations and Maintenance Manual.
USD $283 334.36
MOROWA LANDFILL Nine cell solid waste landfill facility with hazardous waste cell, for all domestic, office, canteen and some workshop waste. Project design, Management of construction Site development plan showing the project when completely filled, Site preparation plan, Details of leachate pipework and manholes, Details of storm water drainage and access roads to site, Construction details, Solid waste collection and disposal operations and maintenance manuals
USD$ 250 000.00
MARONDERA ASSESSMENT
AND RAPID APPRAISAL
REPORT FOR SANITATION,
AND DESIGN AND
IMPLEMENTATION FOR MUNICIPAL LANDFILL
Preliminary investigation and preparation of sketch designs, Terms of reference for Environmental impact assessment, Review EIA report, Geotechnical and topographical surveys, Liaising with the relevant stakeholders, Composite liner systems, Details of leachate collection and management systems, Details of storm water drainage and access roads to site, Construction details, Cost estimates, Site supervision, Landfill planning strategies, Training for operational staff and preparation of the Operations and Maintenance Manual, Preparation of tender documents, Tender adjudication and Construction supervision
USD$ 450 000.00
TROJAN MINE LANDFILL Project Design and Management of Construction. Site preparation plan,Geo technical surveys, Topographical surveys, Details of leachate collection and management systems, Details of storm water drainage and access roads to site, Construction details
USD$ 600 000.00
NGEZI MINE DEVELOPMENT -
PROPOSED LANDFILL
Solid waste landfill facility for domestic canteen and office waste. Preliminary investigations and report, Design proposals
USD $250 000.00
VICTORIA FALLS LANDFILL Design proposal, Draft master plan
USD $180 000.00
BOSTWANA
GHANZI LANDFILL
DEVELOPMENT
Solid waste landfill development for town with about 8000 population. Project design, Management of construction, Site development plan showing the project when completely filled, Site preparation plan, Details of leachate collection and management systems, Details of storm water drainage and access roads to site, Construction detailsPreliminary investigation and preparation of sketch designs, Terms of reference for Environmental impact assessment, Review EIA report, Geotechnical and topographical surveys, Liaising with the relevant stakeholders, Composite liner systems, Details of leachate collection and management systems, Details of storm water drainage and access roads to site, Construction details, Cost estimates, Site supervision, Landfill planning strategies, Training for operational staff and preparation of the Operations and Maintenance Manual, Preparation of tender documents, Tender adjudication and Construction supervision
USD 290 000.00
SWAZILAND
PIGG’S PEAKE
INFRASTRUCTURE
Preliminary site investigations, Project design, Management of construction, Site development plan showing the project when completely filled, Site preparation plan, Details of leachate pipework and manholes, Details of storm water drainage and access roads to site, Construction details, Solid waste collection and disposal operations and maintenance manuals.
USD 250 000